Putting Green
Temporary Installation • Client: American Express & GQ magazine
• Team: Nathaniel Kolbe, Benjamin Walton, Lida Charsouli, Christiaan
Hiemstra • Location: Canary Wharf, London 2010 • with Consolidated
PR, Photographer: Nathan Gallagher & Video: Instant Productions
The making of the putting green required the use of high-tech and age
old processes. The putting green body was milled using a CNC router out
of 17 blocks of polystyrene foam. This high-tech tooling allowed for a
continuous surface to be seamlessly assembled on site with minimal adjustment. |